SCADA system for nuclear industry

From the very beginning, Matex Controls has taken up difficult challenges. As early as in 2003 we had the pleasure to cooperate for the first time with Broschier on designing and implementing an automation system in the Ignalina Nuclear Power Plant in Lithuania. The project involved performing an automated regulation of the ventilation system of the temporary storage of radioactive waste.

By the end of 2013 we were chosen the general contractor of the SCADA industrial automation system. The scope of work includes a detailed design study and implementation of the HVAC control system in the Ignalina Nuclear Power Plant in Lithuania. The tasks of Matex Controls include creating the design of the building management system, preparing documentation of the automation system and installing systems directly at the site in Lithuania.

Our company specialises in solving difficult tasks. Our interdisciplinary knowledge and great experience allow us to constantly face new challenges. We hope that there are many such interesting projects for us ahead.

<< Back