Greenwings

Name of the building: Greenwings
Location: Warsaw, Cybernetyki 21
Date of the project: September 2014 – October 2014

Greenwings is a A class office building in close to the International Chopin Airport in Warsaw, opposite the VIP terminal. The building has a BREEAM certificate and offers a total of seven floors of a 10 850 sq m of office space and conference rooms of the highest standard, and 270 underground parking spaces on three levels of underground parking.

Total area – 10 850 sq m

Scope of work:
Comprehensive execution of mechanical installations of office arrangement of Goodyear Dunlop Tire Poland.

Scope of execution works:

  • Supply and exhaust ventilation’s installation for offices,
  • Delivery and assembly of rooms air-conditioning based on the individual channel fan coils and slot diffusers,
  • Installation of technological heat and chilled water for fan coils,
  • Condensate installation with sensors and calibration,
  • Water and sewerage installation,
  • Hydrant system,
  • Supply and installation of individual air-conditioning installation on server room based on the split unit,
  • Execution and measurements in the ventilation and noise measurements,
  • As-built documentation, operating instructions and use of the building instruction.
<< Back
Duration of the project

6 weeks

Area

1212 sq m

Fan coil units

73 pieces